Season 35
(2013)
Overview
Jersey Shore Rebuilds 2013; Arlington 2014
Cast
as Self - Host
as Self - Plumbing and Heating Expert
as Self - Master Carpenter
as Self - General Contractor
as Self - Landscape Contractor
Episodes
Jersey Shore Rebuilds 2013 Part 1: Sandy and the Jersey Shore 0.0
October 5, 2013
For the first time, This Old House takes on three homes at the same time. The team meets the homeowners and discusses r…
Jersey Shore Rebuilds 2013 Part 2: Drastic Measures 0.0
October 12, 2013
The team discusses how FEMA impacts building requirements, and foundation options. The Manasquan home is razed. Kevin t…
Jersey Shore Rebuilds 2013 Part 3: Getting to Work 0.0
October 19, 2013
The Mantoloking home is examined from a new angle while the Bay Head house begins framing. The team learns about a inno…
Jersey Shore Rebuilds 2013 Part 4: Built for Speed 0.0
October 26, 2013
The show visits the boardwalk at Seaside Heights to view reconstruction. The Bay Head home has a new deck installed. Th…
Jersey Shore Rebuilds 2013 Part 5: Lines in the Sand 0.0
November 2, 2013
The windows are installed at the Bay Head house. At Point Pleasant a new dinning room is installed in place of the gara…
Jersey Shore Rebuilds 2013 Part 6: Go With the Flow 0.0
November 9, 2013
Breakaway walls and flood vents are installed at the Point Pleasant. The work on the modular home continues. What plant…
Jersey Shore Rebuilds 2013 Part 7: Stories From Sea Level 0.0
November 16, 2013
Footings are added in Bay Head home. Point Pleasant gets stone veneer, fiber-cement siding and composite decking. Manas…
Jersey Shore Rebuilds 2013 Part 8: One Year Later 0.0
November 23, 2013
A tour of the Mantoloking project. And the wrap party for the Jersey Shore projects.
Arlington 2014: Part 1: A New Project 0.0
January 2, 2014
The crew begins work on Italianate-style home originally dating to 1872.
Arlington 2014: Part 2: Old House Discoveries 0.0
January 9, 2014
Richard visits a water tank that has been disguised as a Greek temple. During demolition, the crew finds traces of the …
Arlington 2014: Part 3: Concrete Jungle 0.0
January 16, 2014
Kevin, Norm, Tom, and mason Mark McCullough replace the substandard foundation by pouring a new slab and curb, all whil…
Arlington 2014: Part 4: Quest for a Dry Basement 0.0
January 23, 2014
Tom joins the home's new roof to the existing. Architect David The architect explains how much change an 200 additional…
Arlington 2014: Part 5: Getting to Level 0.0
February 1, 2014
Leveling the ceiling in the kitchen and the floor in the finished basement is explained. An opening for a new window is…
Arlington 2014: Part 6: Additional Details 0.0
February 8, 2014
The new kitchen windows are inspected. Cast iron waste pipes are installed with a traditional lead and oakum joint. Out…
Arlington 2014: Part 7: Arlington Heights 0.0
February 15, 2014
Selective tree pruning occurs in the yard. Inside, Richard explains the choice between PEX and copper for water supply…
Arlington 2014: Part 8: Italianate Inspiration 0.0
February 22, 2014
Exterior colors are proposed. A tour of a nearby 1870 Italianate style home. Richard shows a more attractive approach t…
Arlington 2014: Part 9: Deadliest Old House? 0.0
March 1, 2014
A "Deadliest Catch" star drops by to help with plaster cracks. Making the second floor railing safer.
Arlington 2014: Part 10: Old World New World 0.0
March 8, 2014
Installing steps with ice. More plaster repairs. The use of 3D-printing for home repair. Review of the front porch de…
Arlington 2014: Part 11: House vs. Nature 0.0
March 15, 2014
A hydrangea that is damaging the foundation is removed. Painting with red paint. How to keep the basement dry.
Arlington 2014: Part 12: Water Water Everywhere 0.0
March 22, 2014
A visit to Spy Pond in Massachusetts. A new water main is installed. Chestnut flooring is selected. Fiberglass gutters…
Arlington 2014: Part 13: Brick, Trim and Tile 0.0
March 29, 2014
A sidewalk is prepared. Custom moldings are installed. Tiles are picked by the homeowner. New doors and countertops a…
Arlington 2014: Part 14: Soapstone, Marble, Oval Picture Frame 0.0
April 5, 2014
Adding the final edge detail to soapstone countertops; cutting down 12-inch marble tiles for wainscoting; oval mirror f…
Arlington 2014: Part 15: Made in the Shade 0.0
April 12, 2014
Installing a custom PVC fence and arbor; creating a marble herringbone pattern in the powder room; grout options for th…
Arlington 2014: Part 16: Decorative Details 0.0
April 19, 2014
A teak island top is installed in the kitchen; a vanity top is added to the master bath; an electronics nook is built; …
Arlington 2014: Part 17: Sod, Garbage Disposers, Crown Molding 0.0
April 26, 2014
A truckload of fresh sod is rolled out; a replica ceiling medallion made with a 3D printer and a custom copper vent hoo…
Arlington 2014: Part 18: Italianate Renaissance 0.0
May 3, 2014
The Arlington Italianate project concludes with a look at how the master bath was modified to accommodate a steam showe…